Live Data Streaming
A reading every 3 minutes. Voltage, current, power, and energy on each phase — straight from the meter to your dashboard.
Engineer-installed smart meter. Live data every 3 minutes. Open the dashboard from any browser — see exactly where every unit goes, when it costs most, and what to fix.
Real-time energy monitoring
A reading every 3 minutes. Voltage, current, power, and energy on each phase — straight from the meter to your dashboard.
Our engineer installs a 3-phase smart meter at your facility. Non-invasive CT clamps. No production downtime.
Open it in any browser, any phone. Live kW, today's peak, peak-vs-off-peak split, exports, generator runtime.
Wattey auto-classifies every meter from its own telemetry. You can override the type any time — no waiting on installer notes or guessing.
For sites that just buy from the grid.
Live example
Al Haram Paper Mill
Bhikki facility · Kasur
For sites with rooftop solar exporting to the grid.
Live example
5T Gulberg
3rd Floor net-metered · Lahore
For sites running grid + generator + solar together.
Live example
Lahore Continental Hotel
Main building · Lahore
Wattey tracks them automatically — using the PITC seasonal schedule that updates by month. You see exactly how much of today's bill came from peak hours, and what to shift.
Peak vs Off-Peak Hours
Mall of Mureedkay · Today
Peak total
158.9 kWh
Rs 72/kWh
Off-peak net
−12.4 kWh
Net producer this window
Energy
Mall of Mureedkay · Lifetime
56,991kWh
lifetime
35,932kWh
lifetime
21,059kWh
lifetime
We track import and export separately, then show the net. When your panels send more to the grid than you draw, the number goes negative — exactly like your net-metering bill.
Eight real client sites across four cities. The same platform — different load profiles, different meter types, all live.
Three meters across one mall complex — main, generator, and adjacent building. Tracked together.
Sheikhupura district
Generator runtime tracked automatically. Energy split between grid and backup.
Lahore
24/7 production load. Constant 14 kW per phase visibility.
Kasur
Refrigeration and milking loads + rooftop solar. Net metering tracked.
Sargodha
Multi-floor commercial building with separate per-floor metering.
Lahore (Gulberg)
Heavy machinery on multiple phases. Phase imbalance detection.
Raiwaind
Multiple production units, QC labs, warehouses. 7 meters at one site.
Pakistan
High-power dyeing equipment. Per-shift energy tracking.
Sheikhupura
A BijliBachao engineer visits your facility, walks the panels with you, and writes a short report: where to install, how many meters, what you'll see in the dashboard. No commitment.
Free · No commitment
Engineer visits within 3 working days
Smart 3-phase meter installed on your service entrance with non-invasive CT clamps. No production downtime. Hooks into your WiFi for live data uplink.
Non-invasive
Zero production downtime
Once the meter sends its first reading (within minutes of install), your dashboard is live. Open it in any browser, on your phone, anywhere.

Engr. Reyyan Niaz Khan
Founder · BijliBachao.pk
"Pakistani factories deserve the same energy visibility multinationals have had for decades. Wattey is how we deliver it."
UET Lahore
Engineering
14+ years
Pakistan electricity sector
50+ MNCs
Prior consulting
BijliBachao.pk
Founder & Director
We start with a free site survey — no commitment. Pricing depends on the number of meters, the size of your facility, and any special requirements. Reyyan will quote you directly after the survey.
A typical installation takes 2–4 hours per meter, with zero production downtime. From signing on to seeing live data: usually 5 working days (3 days for the survey, 2 for the install).
We currently have live installations in Lahore, Sheikhupura district, Kasur, and Sargodha. Anywhere in Pakistan with WiFi or 4G coverage is feasible — Reyyan will confirm during the survey.
A 3-phase smart meter that reports voltage, current, power, power factor, frequency, and energy on each phase. Non-invasive CT clamps. The meter connects to your WiFi for data uplink. No production interruption.
Yes. Data is sent over encrypted connections to AWS infrastructure. Each client only sees their own data — complete isolation. Every administrative action is logged.
Yes. WhatsApp Reyyan and he'll walk you through the live dashboard of one of our existing client sites (with the client's permission, anonymized) during your call.
Free site visit · Engineer-installed meter · Live data within minutes of install · No long-term contract.
Reyyan responds personally