A product of BijliBachao.pk · Pakistan

Know your electricity.
Cut your bill.

Engineer-installed smart meter. Live data every 3 minutes. Open the dashboard from any browser — see exactly where every unit goes, when it costs most, and what to fix.

  • Engineer-installed
  • Live every 3 minutes
  • Browser dashboard
  • No long-term contract
wattey.bijlibachao.pk

Live Dashboard

Real-time energy monitoring

Live
Total Power
50,000W
Today
6,508.4kWh
Peak vs Off-Peak Hours
Peak Hours
6 PM – 10 PM (4h)
16.95 kWh
Off-Peak
Remaining 20h
58.81 kWh
Peak: 22.4%Off-Peak: 77.6%
Yesterday Peak: 17.4% → +5% today
Voltage (3 Phase)
Last 30 min
Phase A
224V
Phase B
221V
Phase C
226V
ABC✓ Balanced
12 meters online · 1.26 GWh lifetimejust now
See this for your factory
What you get

Three things, working together.

Live Data Streaming

A reading every 3 minutes. Voltage, current, power, and energy on each phase — straight from the meter to your dashboard.

every 3 min

Physical Meter Installation

Our engineer installs a 3-phase smart meter at your facility. Non-invasive CT clamps. No production downtime.

3.2kW
R
Y
B

Live Dashboard

Open it in any browser, any phone. Live kW, today's peak, peak-vs-off-peak split, exports, generator runtime.

Real platform · Real numbers · Real today

Built on data we ship every 3 minutes — not on slide-deck claims.

661,055
readings captured live
13sites
real client facilities
4cities
across Pakistan
1.26 GWh
energy monitored to date
Hardware that knows itself

1T · SM · 2T.
The right meter for the right site.

Wattey auto-classifies every meter from its own telemetry. You can override the type any time — no waiting on installer notes or guessing.

1T

Single-tariff meter

For sites that just buy from the grid.

  • Live kW, kWh today, kWh this month
  • Peak vs off-peak hour split
  • Voltage / current / power factor per phase

Live example

Al Haram Paper Mill

Bhikki facility · Kasur

SM

Solar Meter (net metering)

For sites with rooftop solar exporting to the grid.

  • Everything in 1T, plus:
  • Import vs export tracked separately
  • Peak/off-peak shows NET (import − export)

Live example

5T Gulberg

3rd Floor net-metered · Lahore

2T

2T Meter (super)

For sites running grid + generator + solar together.

  • Everything in SM, plus:
  • Generator runtime and kWh tracked
  • Auto-detection when generator kicks in

Live example

Lahore Continental Hotel

Main building · Lahore

Peak vs off-peak

Pakistan's peak hours cost up to 2× off-peak.

Wattey tracks them automatically — using the PITC seasonal schedule that updates by month. You see exactly how much of today's bill came from peak hours, and what to shift.

  • Seasonal peak windows auto-applied (currently 6 PM – 10 PM PKT)
  • For solar meters, the chart shows net = import − export — bars dip below zero when you're producing

Peak vs Off-Peak Hours

Mall of Mureedkay · Today

SM
06121824
Off-peakPeak (6 PM – 10 PM)Net export (solar)

Peak total

158.9 kWh

Rs 72/kWh

Off-peak net

−12.4 kWh

Net producer this window

Energy

Mall of Mureedkay · Lifetime

SM
Total throughput (APEG)

56,991kWh

lifetime

Imported from grid

35,932kWh

lifetime

Exported to grid

21,059kWh

lifetime

Net consumed = import − export = 14,873 kWh91 days of data
Solar / Net metering

Solar exports the way NEPRA actually counts.

We track import and export separately, then show the net. When your panels send more to the grid than you draw, the number goes negative — exactly like your net-metering bill.

  • Net = import − export. Same math NEPRA uses on your bill.
  • Tracks per-phase so you catch wiring errors before they cost you money.
  • Auto-detects when panels go live (no waiting on configuration).
Where Wattey runs today

Built for Pakistani factories, mills, malls, hotels & farms.

Eight real client sites across four cities. The same platform — different load profiles, different meter types, all live.

2T

Shopping malls

Three meters across one mall complex — main, generator, and adjacent building. Tracked together.

Sheikhupura district

2T

Hotels & hospitality

Generator runtime tracked automatically. Energy split between grid and backup.

Lahore

1T

Paper mill

24/7 production load. Constant 14 kW per phase visibility.

Kasur

SM

Dairy farm

Refrigeration and milking loads + rooftop solar. Net metering tracked.

Sargodha

SM

Commercial offices

Multi-floor commercial building with separate per-floor metering.

Lahore (Gulberg)

SM

Engineering workshops

Heavy machinery on multiple phases. Phase imbalance detection.

Raiwaind

1T

Manufacturing & warehousing

Multiple production units, QC labs, warehouses. 7 meters at one site.

Pakistan

1T

Textile dyeing & finishing

High-power dyeing equipment. Per-shift energy tracking.

Sheikhupura

From signing on to seeing live data: ~5 working days

Survey. Install. Live.

01

Free site survey

A BijliBachao engineer visits your facility, walks the panels with you, and writes a short report: where to install, how many meters, what you'll see in the dashboard. No commitment.

Free · No commitment

Engineer visits within 3 working days

02

Engineer-installed meter

Smart 3-phase meter installed on your service entrance with non-invasive CT clamps. No production downtime. Hooks into your WiFi for live data uplink.

WATTEY
RYB

Non-invasive

Zero production downtime

03

Live data, same day

Once the meter sends its first reading (within minutes of install), your dashboard is live. Open it in any browser, on your phone, anywhere.

5.1kW nowLIVE
Engr. Reyyan Niaz Khan, Founder & Director, BijliBachao.pk

Engr. Reyyan Niaz Khan

Founder · BijliBachao.pk

Founder

14 years measuring Pakistani electricity.

"Pakistani factories deserve the same energy visibility multinationals have had for decades. Wattey is how we deliver it."
— Reyyan Niaz Khan
  • UET Lahore

    Engineering

  • 14+ years

    Pakistan electricity sector

  • 50+ MNCs

    Prior consulting

  • BijliBachao.pk

    Founder & Director

FAQ

What people ask before they buy.

How much does Wattey cost?

We start with a free site survey — no commitment. Pricing depends on the number of meters, the size of your facility, and any special requirements. Reyyan will quote you directly after the survey.

How long does installation take?

A typical installation takes 2–4 hours per meter, with zero production downtime. From signing on to seeing live data: usually 5 working days (3 days for the survey, 2 for the install).

Where in Pakistan do you operate?

We currently have live installations in Lahore, Sheikhupura district, Kasur, and Sargodha. Anywhere in Pakistan with WiFi or 4G coverage is feasible — Reyyan will confirm during the survey.

What hardware do you install?

A 3-phase smart meter that reports voltage, current, power, power factor, frequency, and energy on each phase. Non-invasive CT clamps. The meter connects to your WiFi for data uplink. No production interruption.

Is my data secure?

Yes. Data is sent over encrypted connections to AWS infrastructure. Each client only sees their own data — complete isolation. Every administrative action is logged.

Can I see a live demo before signing on?

Yes. WhatsApp Reyyan and he'll walk you through the live dashboard of one of our existing client sites (with the client's permission, anonymized) during your call.

Still have questions? WhatsApp Reyyan directly →

Ready to know where every unit goes?

Free site visit · Engineer-installed meter · Live data within minutes of install · No long-term contract.

R

Reyyan responds personally

typically within 2 hours